Logo
  • Home
  • About Us
  • Projects
  • Services
  • Download
  • Gallery
  • עברית Ελληνικά
Contact

Projects

Home > Projects
Leviathan Onshore Development
CP Coordination activities, Supervision, Commissioning and Acceptance Tests

Pipeline Length: 25 Km

Client: Noble Energy Inc.

Year: 2019

 
Download PDF
HP 24" natural gas pipeline to Jerusalem
CP Supervision

Pipeline Lengh: 17 Km

Client: INGL

Year: 2018
Anode-bed installation and CP arrangements for pipeline under highway
Project Management and Tecnical Supervision of anode-bed installation and CP arrangements for pipeline under highway

Client: INGL

Yaer: 2020
HP 24" natural gas pipeline to Gaza Palestine
CP Design

Pipeline length: 40 Km

Client: INGL

Year: 2020
 
Download PDF
Eshel Hanasi-Mishor Rotem 12" and 10" Fuel Pipelines
CP Design

Pipelines Length: 84.5 Km + 84.5 km

Client: Petroleum & Energy Infrastructures Ltd (PEI)

Year: 2019
BAZAN- Elroy 12" Fuel Pipeline
CP Design

Pipeline Length: 11.5 Km

Client: Petroleum & Energy Infrastructures Ltd (PEI)

Year: 2019

 
Karish – Tanin onshore HP natural gas 32"
CP Design

Pipeline Length: 1.2 Km

Engineering Contractor: TechnipFMC plus TMNG

Year: 2020


Client: Energean Oil&Gas
HP natural gas 18" Beer Tuvia
CP Supervision

Pipeline Length: 9.5 Km

Year: 2019

Client: INGL
Jenin Natural Gas Pipeline & Valve Station
CP Design

Pipeline Length: 0.78 Km

Client: Palestine Power Generation Co.

Year: 2019

 
Download PDF
Formosa Project, Taiwan Seawater Reverse Osmosis Desalination Plant
CP Design for internal super duplex piping

Engineering Contractor: IDE
Client: Formosa Petrochemical Corporation (FPCC)

Year: 2019
 
Download PDF
Mount Holland Lithium Mine
MVC Desalination Unit Corrosion Assessment and Material Review

Engineering Contractor: IDE
Mount Holland Lithium Mine, Kwinana, Western Australia

Year: 2019
 
Download PDF
HP natural gas 24" Orot Rabin Power plant
CP Design for HDD piping inside power plant

Client: INGL

Year: 2018
 
Download PDF
Groundings installations for 36" eastern pipeline
CP project Management

Pipeline Length: 92 Km

Client: INGL

Year: 2018
Charles Meyer Desalination Project
CP Design & Analysis Data for Intake Pump Stations

Engineering Contractor: IDE
Clint: Santa Barbara Municipally

Yaer: 2018
 
Download PDF
Leviathan Production Platform
CP Design for three firewater pump caissons

Engineering Contractor: Wood Group - Mustang
Client: Noble Energy Inc.

Year: 2018

 
Download PDF
HP natural gas 36" Duplication K.Baroch-Dovrat
CP Design plus Design restrain systems to reduce the effects of short cut from nearby HV pilons 161 KV

Pipeline Length: 18.3 Km

Final Client: INGL

Year: 2018

 
 
Download PDF
Download PDF
CIPS survey
Handling data from CIPS surveys for presenting results and decisions making
 
Pipeline Length: >50 Km

Year: 2017
 
Download PDF
N. Eliav Infrastructure and Corrosion Engineering Ltd is at the forefront of technology and offers its customers solutions at TK level including the entire value chain required for corrosion prevention and cathodic protection needs, engineering design, supervision, procurement and supply of equipment, construction, operation and maintenance.

Quick Navigation

  • Home
  • Projects
  • Services
  • Contact
  • Privacy Policy

Contact

  • Business Development + 972523554322
  • Accounting + 972526413651
  • office@ne-coreng.com
LinkedIn

© 2020. All rights reserved.

This website is powered by Droxit Logo Droxit platform.
מערכת נגישות חכמה Droxit.com